NEW ENERGY · LITHIUM BATTERY INDUSTRY

New Energy Lithium Battery Industry Digital Solution

Every cell carries complete data evidence from identity registration through testing, binning and reuse

Digitalization in the lithium battery industry is not only about recording output and test results. It must connect every cell's origin, performance, status and final destination. Around pack receiving, single-cell registration, testing and aging, binning and matching, equipment verification and finished-goods traceability, a continuous digital business chain is established.

Single-cell TraceabilityGrading / OCV / OCR Data Linked48–72 Hour Aging WindowCapacity / Resistance / CC Ratio MatchingSemi-automatic Line Scan Control
Retired Pack→ Single Cell→ Grading / Aging→ Standard Matching→ New Pack
Cell-level TraceabilityOld-pack code, new cell code, trays and fixtures linked
Aging Window Control48–72 hour OCV window with overrun rules
Multi-metric MatchingCapacity, internal resistance and CC-ratio verification
Four Terminal TypesWeb, workstation client, PDA, shop-floor dashboard

Practice basis: a retired battery pack dismantling, repair and reuse project at a power lithium battery manufacturer in East China. What follows are capabilities supported by that project in this specific scenario, not a commitment to cover every new-cell manufacturing process in the lithium battery industry.

Industry Challenges

Quality management in lithium batteries is hard because every cell has a different history

In retired power battery reuse, cells are no longer uniform new material: they may come from different obsolete packs and have gone through different use, dismantling, repair and test processes. What the business needs is not only a decision on whether a cell can be used, but data evidence for why a particular grouping is acceptable.

01

Complex cell origin — identity and history break after dismantling

Recovered packs carry model, production date, series-parallel configuration and cell count, but once dismantled into individual cells, the old pack, the new code, the tray and subsequent test records must be bound in time. Otherwise a later quality issue cannot be traced back to its origin and flow.

02

Grading and aging span multiple time windows — manual watching misses steps

Cell offline, rack binding, resting, 2-day OCV and 7-day OCR each involve different states and time points. Rules are needed for inbound operations, test windows, overdue re-testing and abnormal rack binding, so the floor does not depend on paper records and manual reminders.

03

Capacity, internal resistance and CC ratio differ — consistency is hard to judge by experience alone

Every cell's performance results differ. Selecting by appearance or a single indicator makes it hard to verify that all cells in a group simultaneously meet the target pack model, capacity range, internal resistance range and constant-current ratio difference conditions.

04

Semi-automatic equipment, warehousing and order systems stand apart — execution results are hard to reconcile

The floor combines PDA receiving and boxing, workstation scanning and a grading system, alongside a semi-automatic matching line and a third-party ERP. The matching list, the cells actually scanned, the test data and the order completion information must agree to reduce information breaks caused by manual reconciliation.

Solution Overview

A cell barcode backbone connects shop-floor execution, performance testing and finished-goods ownership

The solution uses battery pack barcode — cell barcode — tray / fixture barcode — rack barcode — new pack barcode as its relationship chain, turning dismantling, repair marking, grading, aging, binning, matching and shipping into a queryable record chain. In the reference project, the Cobweb MES framework supports a coordinated set of Web management, workstation clients, Android PDA and shop-floor visual dashboards.

Business Collaboration
Business objectsERP orders, production work orders, matching sequence numbers, completion records
Role on the floorTakes in plans, organizes matching execution, and returns completion results per the interface agreement
MES Execution
Business objectsPack and cell records, grading and aging records, bin standards, matching lists, bidirectional traceability
Role on the floorKeeps every cell's origin, test performance, status and destination correlated
Workstation Operations
Business objectsWeb, WinForms workstation client, Android PDA, scanning and label printing
Role on the floorPerforms receiving, boxing, fixture transfer, inbound/outbound, scrap and matching operations
Equipment & Visual Layer
Business objectsGrading system, semi-automatic matching line, aging racks, shop-floor dashboard
Role on the floorAcquires test data, performs matching verification, and displays output and aging inventory status

Thread through the process:retired pack → cell registration → testing and aging → binning and standard verification → new pack → bidirectional traceability.

Process Digitalization

From recovered pack to re-matching, a continuous manufacturing and quality record

The reference project uses "pack release → cell boxing → steel-ball insertion → capacity grading → 2-day OCV → 7-day OCR → binning → matching" as its core routing, connected with UV release, rack management, matching verification and finished-goods business. The actual process and test conditions should still follow each plant's own standards.

STAGE 01

Pack Receiving, Dismantling and Cell Registration

Pack receiving → PDA scan parsing → dismantling into cells → cell re-coding → tray scan binding → registration and station tracking

Scanning reads the recovered pack's serial number, model, protection board information, production date, series-parallel configuration, cell count and origin. Necessary fields can be supplemented and duplicate scans are rejected. After dismantling, cell barcodes are bound to tray barcodes in batches, establishing the cell's base record and origin relationship.

Typical data pointsOld pack barcodeModelSeries-parallelNew cell codeTray barcodeOrigin record
STAGE 02

Repair Marking, Tooling Flow and Capacity Grading

Steel-ball station tracking → UV release → tray-to-fixture transfer → capacity grading → offline scanning → rack binding and inbound

Scanning at the steel-ball stations captures repair-line output; UV release handles the container relationship between trays and cell fixtures. The grading system synchronizes capacity, internal resistance and constant-current ratio through the agreed interface. Inbound confirmation uses rack and fixture barcodes to establish position, and applies the project-configured ±1.5 hour test window verification.

Typical data pointsRepair station trackingCell-fixture relationGrading resultsRack positionInbound time
STAGE 03

OCV / OCR Aging, Inventory Status and Cell Binning

Grading offline → resting and aging → 2-day OCV (48–72 hours) → 7-day OCR → rule-based binning → defect registration / scrap

Using the grading offline time as the basis, the system manages countdowns and rack status during aging. The reference project sets 48–72 hours as the 2-day OCV test window; beyond 72 hours, cells must be re-graded per process requirements, while special cases such as an already valid 2-day test record have their own handling logic. Bins are determined by model and ampere-hour requirements together with capacity and internal resistance results, recording good and defective status.

Typical data pointsOffline timeOCV / OCR recordRack statusCapacityInternal resistanceBinDefect reason
STAGE 04

Work-order Matching, Line Verification and Finished-goods Traceability

Order / work order → cell screening → in-group consistency check → matching list → semi-automatic cell-by-cell scan → new pack barcode → finished-goods inbound and shipping

Based on the matching work order and pack model, cells are screened by capacity limits, internal resistance range and constant-current ratio difference. The matching line submits the actually scanned cell list to MES, which verifies it against the group's matching standard. New pack identity is managed through the project's 16-digit / 20-digit pack coding rules and linked to finished-goods ownership and order business.

Typical data pointsOrder numberMatching work orderMatching sequenceScreening conditionsPer-cell verificationNew pack barcode

Thread through the whole business:new pack ↔ constituent cells ↔ repair / station records ↔ grading and aging data ↔ source retired pack.

The routing above is summarized from the reference project; it is not a fixed production sequence common to all lithium battery manufacturers. Actual processes and test conditions follow each plant's standards.

Industry Scenarios

Six application scenarios that put cell traceability and consistency requirements onto the shop floor

Covering the core business from old-pack receiving, container flow and grading/aging to binning, matching, line verification and full traceability.

SCENARIO 01

Scan Receiving and Identity Inheritance for Recovered Packs

The old pack's origin is never lost, and every cell's starting point remains findable after dismantling.

PDA reads the old pack's QR information and records model, production date, series-parallel configuration, cell count and necessary origin attributes. Dismantled cells are re-coded and linked to the old pack through barcodes; duplicate-scan rejection reduces duplicate receiving and record confusion.

Old Pack QRCell RegistrationOrigin LinkDuplicate Scan Rejection
SCENARIO 02

Coordinated Trays, Fixtures and Station Tracking

Wherever material moves, the link between cell and container is updated.

Using separate tray and fixture barcodes with capacity management, the system records cell boxing, batch binding, station tracking and tray-to-fixture transfer. Together with repair-line output scanning, UV release and PDA scrap registration, it removes the "cell recorded, container not recorded" gap.

Tray BindingFixture ManagementUV ReleaseScan TrackingScrap Registration
SCENARIO 03

Grading Data and Dynamic Aging Inventory Dashboard

Not only what a cell measured, but when its next test is due.

The grading system synchronizes capacity, internal resistance and related test parameters. Aging racks map to fixture barcodes and show pending, approaching-window and in-window status by offline time. Grading offline inbound and 2-day / 7-day aging inventory transfers are all recorded, letting the floor schedule work by status.

Grading DataOCV / OCR48–72 Hour WindowRack BindingInventory Dashboard
SCENARIO 04

Multi-metric Binning and In-group Consistency Verification

Moving from experienced picking to screening against explicit standards.

Bins and matching requirements are configured by cell model, ampere-hour and target pack model. Combined with capacity limits, internal resistance range, constant-current ratio difference and multiple control rules, eligible cells are screened and a reviewable grouping record is produced.

Capacity LimitsResistance RangeCC Ratio FilterBin ManagementGrouping Record
SCENARIO 05

Real-time Scan Verification on the Semi-automatic Matching Line

The planned cell combination matches the cells actually scanned on the line.

The system builds the matching list from the work order; the semi-automatic line scans cell by cell following its station flow and uploads the cell barcode list through the interface, where MES performs the matching-standard verification. Cells that do not meet requirements are controlled on the spot per the agreed equipment-system interface logic, reducing mismatch and mixing risk.

Matching Work OrderEquipment InterfaceScan UploadIn-group VerificationMismatch Rejection
SCENARIO 06

Production Dashboard, ERP Integration and Bidirectional Traceability

Managers see progress, quality staff see origin, the floor sees destination.

Output and status are presented across seven process categories — pack release, cell batching, repair, performance testing, binning, UV release and matching. ERP interfaces connect plans and completion data, and reports cover packs, cells, scrap and grouping records. You can trace forward from a new pack to its constituent cells, or backward from an old pack or single cell to its later destination.

Seven-process DashboardERP BidirectionalCell Status StatisticsBidirectional Traceability
Equipment & System Connectivity

Only when equipment, test systems and terminals are connected does data return to the cell record

The approach is to integrate according to each device's actual interface capability. Not every workstation requires complex equipment modification: some are better served by scan-based collection, while test and matching equipment with interfaces cooperate with MES through data exchange.

Test & Matching Equipment
  • Grading cabinet / systemScheduled data syncGrading, OCV, OCR, capacity, internal resistance, CC ratio
  • Matching tooling and semi-automatic lineHTTP POST / JSONSubmits barcode list to MES; verifies actual cells per work order
  • Steel-ball machine / stationScan trackingRepair-line output and cell station history
Tooling Flow & Aging Storage
  • UV release stationStation operationTray, fixture and cell binding / unbinding
  • 2-day / 7-day aging racksRack and fixture scanningInbound/outbound, position, test window and status
Identification, Collection & Terminals
  • PDA / scanner / label printerScanning and label printingOld pack, cell, tray and new pack codes
  • WinForms workstation clientShop-floor executionStation tracking, binding and inbound operations
  • Android PDA / Web consoleRole-based useMobile operations, queries and management
Visualization & Enterprise Systems
  • 65-inch 4K shop-floor displayScheduled refreshAging inventory, output and process status
  • Third-party ERPBidirectional interfaceOrder plan release and completion write-back

Interface scope:in the reference project, the semi-automatic line uploads the matching cell list via HTTP POST / JSON, the grading system synchronizes test data on a schedule, and ERP exchanges plan and completion information. Fields, frequency and scan-rejection feedback are subject to the equipment interface protocol and site conditions.

Consistency & Quality Loop

From "test passed" to "do the cells in this group truly meet consistency requirements"

Whether a cell can be used for matching cannot rest on a single test result alone. Its origin, grading results, aging status and the combination conditions required by the target pack all matter. The reference project links performance testing, bin determination, time-window control and per-cell matching verification into an executable on-site quality management chain.

Multiple consistency standards managed by model and work order

Control dimensionRules supported by the projectManagement purpose
Model and ampere-hourCell model, pack model, ampere-hour and series-parallel requirementsPlace cells into the correct target specification
CapacityBin capacity upper and lower limitsFilter out cells outside the target range
Internal resistanceAcceptable resistance range configured by modelCheck cell conditions within the target group
Constant-current ratioCC-ratio difference filteringAdd a further consistency screening condition
Test and aging statusGrading / OCV / OCR records, time window, good / defective statusPrevent cells lacking key results or with mismatched status from entering matching
Cells actually on the linePer-cell scan upload from the semi-automatic line, MES verificationCheck the correspondence between physical cells and matching requirements

Aging window: turning a business rule into a shop-floor action

  • 48–72 hoursThe reference project's 2-day OCV test window. Cells exceeding 72 hours without meeting a valid exception are re-graded per process requirements.
  • ±1.5 hoursProject-specific test-window verification applied at grading offline inbound; the actual starting point and on-site rule are set during implementation.
  • Rack bindingRacks in "in production" status cannot be rebound. Fixtures that already hold a valid 2-day test record, and post-test rebinding cases, follow the project's special branches.
  • Inventory dashboardRed, yellow and green indicators, countdowns and dynamic inventory records help operators plan testing and storage work more intuitively.

Grading offline → pending 2-day status (red) → approaching test window (yellow, within 24 hours) → 2-day OCV window (green, 48–72 hours) → 7-day OCR → test complete

AGING WINDOW · DIAGRAM, TIME POINTS PER REFERENCE PROJECT
Pending 2-dayAfter grading offline
ApproachingWithin 24 hours
OCV Window48–72 hours
7-day OCRTest complete
  • Overrun handlingCells beyond 72 hours that do not meet a valid exception are re-graded per process requirements.
  • Special branchesExisting valid 2-day test records and post-test rack rebinding are configured separately.
  • Visible statusRed-yellow-green countdowns and rack status are shown on both the dashboard and PDA.
01Grading / aging data
02Status and bin decision
03Cell screening by order
04In-group consistency check
05Per-cell device re-check
06Group record and traceability

Matching quality loop: from data collection through status determination, screening and verification to per-cell device re-check, ending in a traceable group record. Cells judged non-conforming can be registered as scrap with a defect reason; conforming cells are recorded with their final grouping and new-pack ownership.

Capability boundary:the core of this solution is rule-based verification on established processes and test data. It is not presented as unverified AI health prediction, automatic life estimation or an absolute safety guarantee.

Customer Practice

A power lithium battery manufacturer in East China: from scanning to standardized matching in retired battery reuse

Web, workstation clients, Android PDA and shop-floor dashboards built on the Cobweb MES framework

Addressing the dismantling, repair, testing, binning and re-matching of retired or second-life lithium battery packs, the manufacturer connects each cell's origin record, test performance, aging status and new-pack ownership, and integrates the grading system, semi-automatic matching line and third-party ERP.

HIGHLIGHT 01

A traceable identity chain for every cell

Barcode relationships are established across old pack receiving, dismantling, new cell coding, boxing, repair station tracking, testing, binning and re-matching. The history of constituent cells can be traced from a new pack, and the final destination can be queried from a single cell.

Capabilities shown:old-to-new code binding · cell traceability · container relations · finished-goods ownership

HIGHLIGHT 02

Aging inventory is no longer a static ledger

Time-window and status management are introduced at grading offline, aging rack binding, 2-day OCV and 7-day OCR. Red-yellow-green countdowns and inventory dashboard prompts help the floor organize follow-up inspection based on the real offline time.

Capabilities shown:48–72 hour window · overrun rules · rack control · dynamic inventory

HIGHLIGHT 03

Matching standards carried into per-cell scanning on semi-automatic equipment

The system defines capacity, internal resistance and CC-ratio matching rules by pack model and work order and screens eligible cells; the semi-automatic line submits its on-site scan list and MES verifies it against the rules, linking the online standard with shop-floor execution.

Capabilities shown:model-based bins · multi-condition matching · HTTP interface · on-site verification

HIGHLIGHT 04

Three terminal types working with the visual dashboard

The Web console carries management and data queries, the WinForms workstation client serves shop-floor operations, and Android PDA supports receiving, boxing, inbound/outbound and scrap as mobile tasks; the shop-floor display shows aging inventory and output. Related functions were continuously adjusted and refined across project iterations from 2022 to 2024.

Capabilities shown:Web · workstation PC · Android PDA · output / aging dashboard

Management capabilities formed by the reference project

DimensionOn-site concernCapability formed by the solution
Identity and originOriginal pack and cell information are hard to relate after dismantlingOld pack, cell, tray, fixture and new pack barcodes are interrelated
Performance and statusGrading and aging data are scatteredTest results and aging inventory status enter the same history
On-site timingAging windows and rack operations rely on manual remindersTime windows, status prompts, rack binding and specific exception rules
Matching standardsMulti-metric consistency is hard to verify cell by cellCapacity, internal resistance and CC-ratio conditions verified by model
Line executionMatching list and actual scan results may divergeInterface verification between the semi-automatic line and MES
Business collaborationOrder plans, production and completion data are separatedERP interfaces with production work orders and completion records

The above describes existing project functions and management capabilities. It does not include unmeasured yield improvement, labor-hour savings, cost reduction or carbon-reduction percentages.

Solution Value

More trustworthy cell data and matching evidence for lithium battery recycling

Clearer cell origin

From the original pack to a single cell, then to trays, fixtures, testing and new-pack ownership, every identity transformation in the reuse process leaves a traceable record.

More orderly testing and aging

Grading, OCV and OCR data are linked to aging inventory status, and time windows with visual prompts help the floor schedule inspection and transfer.

More standardized matching

Capacity, internal resistance and CC-ratio rules are configurable and reviewable in the work order, and per-cell scanning on the semi-automatic line triggers verification, reducing the management risk of experience-based picking and on-site mixing.

More continuous collaboration

PDA, workstation clients, Web, equipment interfaces and ERP work together so receiving, boxing, repair-line output, aging, binning, matching and completion data stay connected along the business process.

More traceable recycling

Forward and backward query is built on single-cell test and group records, providing a basis for defect cause analysis, product record queries and later business review.

Frequently Asked Questions

Business coverage, cell traceability, aging control and matching verification for lithium battery recycling.

Which business processes does the new energy lithium battery solution cover?

This page focuses on retired power battery recycling, the scenario validated by an existing project. It covers battery pack receiving, single-cell registration after dismantling, repair-line station tracking, capacity testing, 2-day OCV, 7-day OCR, binning, re-matching, warehousing and shipping, and business traceability. Cathode and anode preparation, coating, electrolyte injection and new-cell formation are outside the implementation scope evidenced by the project material.

How can every cell's origin be traced from a new battery pack?

By linking the original battery pack barcode, the new cell code, tray and fixture barcodes, station records, capacity and aging data, and the new pack barcode, you can trace forward from a new pack to the origin, repair and test records of its constituent cells, and trace backward from a single cell to its final destination.

How are OCV/OCR testing and aging inventory managed?

The reference project manages aging status from the capacity-testing offline time and sets 48–72 hours as the 2-day OCV test window, with a re-test rule for overruns. Aging inventory is managed through rack binding, inbound and outbound scanning and a red-yellow-green countdown dashboard; special cases such as an existing valid test record are handled by configuration.

How does capacity grading data enter the system? Is manual entry required?

In the reference project, capacity grading, OCV and OCR data are synchronized from the grading system into MES at intervals through an existing interface, including capacity, internal resistance and constant-current ratio parameters. The specific fields, synchronization frequency and exception re-send method depend on the grading system's data interface.

How does the semi-automatic matching line prevent mismatched cells?

The work order first defines the target pack model and matching conditions such as capacity, internal resistance and constant-current ratio, and the system performs candidate cell screening and in-group consistency verification. The equipment submits the scanned cell barcode list per the interface specification, and MES re-checks it against the matching rules. The actual release and rejection feedback logic must be confirmed during equipment interface commissioning.

Are different series-parallel pack configurations and barcode rules supported?

The reference project supports multiple series-parallel matching conditions managed by battery pack model and records the matching sequence number. New packs support the 16-digit and 20-digit coding rules defined in the project along with the corresponding field parsing. Other models or coding formats must be configured and validated against the enterprise's own rules.

How does the system help manage scrap and output on the shop floor?

PDA supports scanning to select a defect reason and register scrap in batches. Dashboards cover output or status for seven process categories — battery pack release, cell batching, repair, performance testing, binning, UV release and matching — together with cell status, daily output, scrap and grouping reports.

Can it integrate with existing ERP, scanning devices and shop-floor dashboards?

The reference project already includes a third-party ERP interface for order plans and completion data, grading system data synchronization, semi-automatic matching line barcode upload, and coordinated use of PDA, workstation PCs, Web and large-screen displays. The actual integration scope should be assessed against existing systems, equipment interfaces and on-site implementation conditions.

Get Started

Every cell: traceable origin, recorded tests, standardized matching, verifiable destination

From pack receiving and dismantling registration through grading and aging, performance binning, semi-automatic line verification and new-pack traceability, we plan a practical digital business chain for real production and recycling in the lithium battery industry.

Phone

400 008 0655

Live Chat

Downloads

WeChat

Copyright © 2019-2026 Shanghai Hegong Software Co., Ltd. Shanghai Public Security No. 31011502014114 Shanghai ICP No. 19036824-1

  • Live Chat
  • Call
  • Back to Top